Our Projects
Construction of 4 Lanning of Aligarh-Kanpur (pkg-1) section from km 140+200 to km 186.000 of NH 91 in the state of Uttar Pradesh under Bharatmala Parijoyana.
Client – National Highway Authority of India
Contractor – Brij Gopal Construction Company
Year – 2022
Development of 6 Lanning of Chittor-Thatchur road (greenfield alignment) from km 96.040 (Pondavakkam) to km 116.100 (Kannigaipair) of nh-716b on hybrid annuity mode under Bharatmala Pariyojana, in the state of Tamilnadu (package-iv).
Client – National Highway Authority of India
Contractor – SS Constructions
Year – 2023
Construction of Koramangala Innovation Hub near Prestige Tech Park, Koramangala Bangalore
Client – Machani Groups, Bangalore
Contractor – Tjn Construction Pvt Ltd.
Year – 2024
Proposed development at Alpha and Bravo RX site in Kolar, Karnataka
Client – Machani Groups, Bangalore
Contractor – Geo Foundations & Structures Pvt Ltd
Year – 2024
Development of 6 Lane Aluru-Jukkuva section of NH-130 CD Road, KM 365+033 to KM 396+800 under Raipur-Visakhapatnam Economic Corridors in the state of Andhra Pradesh.
Client – National Highways Authority of India
Contractor – H G Infra Engineering Ltd
Year – 2023-2024
Development of 6 lane Sargi-Basanwahi section of nh-130-cd road from km: 42+800 to km: 99+500 under Raipur-Visakhapatnam economic corridor in the state of Chhattisgarh on hybrid annuity mode (package-cg-2) length 56.700 km.
Client – National Highways Authority of India
Contractor – Dilip Buildcon Ltd
Year – 2024-2025
Construction of Green Field Port at Ramayapatnam on EPC contract basis, Andhra Pradesh
Client – Ms. Andhra Pradesh Maritime Board (APMB) / Ramayapatnam Port Development Corporation ltd. (RPDCL)
Contractor – NECL-ARIPL JV (M/s. Auro Infra Pvt. Ltd.)
Year – 2024
Constructions of 4 lane Bangalore-Chennai Express way from km 127.000 to KM 156.000 Bangarupalem to Gudipala section in the state of Andhra Pradesh under Bharatmala on hybrid annuity mode (phase-2-pkg-iii).
Client – National Highways Authority of India
Contractor – Dilip Buildcon Ltd
Year – 2023
4 lanning of Sannur to Bikarnakette section from existing KM 698+850 (design KM 691+350) to existing KM 744.190 (design KM 736+362) of NH-169 under Baratmala Pariyojana on hybrid annuity mode in the State of Karnataka.
Client – National Highways Authority of India
Contractor – Dilip Buildcon Ltd
Year – 2023
Shore stabilization at certain location under GE(i) NYC Visakhapatnam
Client – Military Engineering Services
Contractor – SVC Projects Pvt Ltd
Year – 2024-2025
Development of 6 lane Badakumari-Karki section of NH-130-CD road from KM 179+000 to KM 226+500 under Raipur-Visakhapatnam economics corridor in the state of Odisha on hybrid annuity mode (pkg-od-3) (length 47.500 km).
Client – National Highways Authority of India
Contractor – UMSL Limited
Year – 2023
Construction of New Hostel Block-1 & Block-2 Package 1 at AVMC Campus-Commune Panchayat, Pondy Cuddalore main road Kirumampakkam Bahour, Kirumampakkam, Puducherry.
Client – Aarupadai Veedu Medical College
Contractor – Popular Foundations Limited
Year – 2024
Constructions of 4 Lane Bangalore-Chennai Express way from CH 204+500 to CH 230+000 (Arakkonam to Kanchipuram Station) in the State of Tamilnadu under Bharatmala on Hybrid Annuity mode (phase iii-pkg-iii).
Client – National Highway Authority of India
Contractor – D P Jain & Co. Infrastructure Pvt Ltd
Year – 2022
Addition & alteration of existing B+S+5 against the approval of ‘9 boulevard’ (B+S+16) storied block-A, proposed block-B (2B+3S+31) storied both residential M.IG. category apartment building, with G+3 storied community center against ground floor community center for M/s OU Infraprojects Pvt Ltd Self, Pratap Chandra Rout, Bholi Rout.
Client – Odisha Udyog Infra Projects
Contractor – MKSR Constructions Pvt Ltd
Year – 2024
Jindal Steel Power Odisha Limited of experimental Pile Blast furnace-2.
Client – Jindal Steel Power Odisha Limited
Contractor – Ajay Kumar Construction
Year – 2022
Koraput-Singapur Road Doubling Project
Execution of earth-work in formation, major bridge works, minor bridge works, P.Way related works, supply of ballast, station & service building works, plat forms works, foot over bridge works and other allied works from km 33.50 to 61.17 in Baiguda-Laxmipur road section in connection with doubling of existing single line track in Koraput-Singapur road line of wat division east coast railway.
Client- Eco Railway
Contractor-Shivam Condev Pvt Ltd
Year-2024-25
Construction of H.L. bridge over Puri main canal (RD 11.760 km of Canal) on 2.740 km of Trisulia-Baranga road in the district of Cuttack.
Client- Cuttack R&B division
Contractor-rout infrastructure Pvt Ltd
Year-2024-25
Vaishnavi at – One Krishna Brindaban, Bangalore, Karnataka
Client- Vaishnavi at-one Infrastructure LLP
Contractor- Vaishnavi at-one Infrastructure LLP
Year-2024-25
Amga-KI
Client- Am Green (India) Pvt Ltd
Contractor- GG Probuild India Ltd
Year-2024-25
Construction of new double tier 4-lane elevated corridor from Chennai port to Maduravoyal in Chennai PKG 04 & PKG 01
Client- National Highway Authority of India
Contractor- J Kumar Infra Projects Ltd
Year- 2025-26 (continuing)
Mechanisation of EQ-7 berth at Visakhapatnam port.
Client- Vizag Multipurpose Terminal Private Limited
Contractor- Megha Infra Projects
Year- 2025-26 (continuing)
SBR Magnus Project.
Client-sbr magnus
Contractor- Structwel Designers & Consultants Pvt Ltd
Year- 2025-26 (continue)
Reviva/Sri Sai Infra.
Client- Sri Sai Infra
Contractor- Sri Sai Infra
Year-2025-26 (continue)
Proposed important BR No 01 on Phalgu river span 15×45.70 m (open web girder) at DFCC ch:217054.093 in connection with construction of 3rd & 4th line in Gaya– detour section
Client- East Central Railway Construction Organization, Dhanbad division
Contractor- Larsen & Toubro
Year-2025-26 (continue)